PHOTO GALLERY

This is the finished part that goes along with the drawing below. Due to the type of material that was required, this part starts off as an 8" diameter slab.

A very busy drawing. Time to get the colored pencils out.

 

The Tool and Die Guy

Cincinnati Hydro-Tel: before there were CNC machines that could handle 3-D milling, this is how we did it. These machines were monsters and due to the way they were built, could handle very tight tolerances. I purchased this one in 1995 and it tipped the scales at about 30,000 pounds. One of the coolest machines I ever ran.

Print called for a "zero" to be marked in part on a 20 degree angle from center. Tough to hold a stamp at 20 degrees so I used a .060" diameter ball mill and cut it .010" deep. Looks a lot better than a stamp, but not as easy as it looks...had to draw the "zero" in Autocad, dimension it, then program it straight and rotate it 20 degrees. "What's taking so long?" HA!

Finding the center of a slot using a dial indicator

My sine bars, all home-made...3", 5", and 10"

Picking up "X" using a ball dimension.

Picking up "Y" using a ball dimension.

This is what happens when you forget to mill the groove in BEFORE welding! Trying to clamp this pipe assembly so that the face at the top was parallel in both directions was a real challenge.

A robotic welding fixture.

A robotic welding fixture.

Checking an angle location usinga ball dimension and indicator.

My big-ass tramming bar. Don't need it often, but when I do, it's awesome!

One of the harder parts I've had to make from a solid block of steel. Had to be careful not to paint myself into a corner on this one, or I wouldn't have anything to hang on to.

Copper parts always look cool.

From start to finish, nine operations in all (not including the lathe operations to turn the diameter, bore the hole, and face both sides). As you can see from the locations of my "stops," everything was worked from the center line of the hole.